Bathroom – ready for plumbing & fitting the suite

2 and a half weekends later I’ve done all the tiling until the plumbing and electrics are done (hello dad).

I’ve also done most of the grouting. Just got to buff up the tiles to get rid of the cement dust.

In a couple of weeks I should have a fully functioning bathroom 🙂

just needs buffing and the fan to go in

just needs buffing and the fan to go in

alcoves just need grouting

tiling done til shower bought and plumbed in

waiting for sink plumbing to be done

waiting for sink plumbing to be done

need to paint the ugly brown door frame!

need to paint the ugly brown door frame!

Advertisements

Bathroom tiling has begun

Tiling walls is way less pain than tiling floors. 8 hours later I’m still totally shattered and my back hurts, but no knee or ankle pain! 🙂
And tubbed adhesive makes the job lots faster! My hands aren’t cut to shreds yet either. Win, win.

Have done way more than I thought. Really pleased with it too.

bath wall

bath wall

window wall

window wall