Wall Knock Through

The RSJ was put in, and in the process more bricks than thought came loose. Old house, old dry render. This is after the inner layer of bricks has been put back. I had a hole blocked up by the bath tub lol. Lost 3 or 4 hours here.

Inner bricks back in

Fully bricked up

Today the wall was taken down. Because of the rain the roof couldn’t be done today, but better the rain started when it did, else it would’ve been raining directly into the ‘wet room’.

Wall knock through

Wall knock through

My builder also showed me how to make the channels needed for the electric cables and has left me the tools, so I’ll start on them tomorrow eve. Means less labour time, therefore money charged by the sparky.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s